Status on 31.08.2015g.

Today was made:
- Cylinder: change the piston rings, connecting rod bearings, assembled

Status on 31.08.2015g.

Yes, and the gasket itself has changed.
-Engine: put the oil sump (procedure simply put, mingled stretcher on the one hand, and on the other arm of the transverse stabilization), put back the cylinder head, put the beat, pulled timing belt

Status on 31.08.2015g..

in the
-Nepriyatnost: Began to put the carburetor, it turned out that in Carbet somewhere has got to thread a valve idling: - (


No Comments Yet.

Leave a comment