End of "winter session"

End of "winter session"

And so, the first stage of the "winter" repair completed. It has been done: the replacement of the floor of the cabin and, new floor flooring interior and a change of rubber Polycom salon. It insulates the interior sidewall. Replacing the towbar spar. Increased engine cover, made it removable. Replacement steps (steps) interior. Partial coating in places of welds and replacement of iron. The plans - to forward to the spring, waiting for a full body painting, repair of engine, gearbox, RD, replacement of the main pair in bridges and installation of a limited slip differential in the front axle.
PS Before the New Year it was necessary to remove some debris, and the interior is clean, managed to fix the results of the repair work. All a Happy New Year! Health and success in everything!

No Comments Yet.

Leave a comment